Elastic vs. Plastic Section Modulus

Traditionally, civil engineers base design guidelines on elastic section modulus. If you see a section modulus number cited without reference to whether it is plastic or elastic, then the general rule is that this is elastic section modulus. In the rare instances when plastic section modulus is used, the word “plastic” almost always explicitly precedes section modulus. Plastic section modulus is usually used to calculate according to the plastic method and to determine the plastic capacity of cross-sections. The elastic and plastic resistance values are different, and the calculation results may be different.

Steel vs Concrete Tool

Enter your wall dimensions and the values below will adjust automatically.

m
m
retaining wall type construction days total cost cost per linear m cost per square m
Steel Sheet Pile Wall 513.33
Soldier Pile and Lagging Wall 973.60
Concrete Modular Unit Gravity Wall 819.99
Mechanically Stabilized Earth Wall 1028.81
Cast-In-Place Reinforced Concrete Wall 1464.86
Slurry Wall 2266.88

Approximate cost and construction time for different wall types is based on 2009 RSMeans pricing for the US and extrapolated from the 2009 NASSPA Retaining Wall Comparison Technical Report,